

Recently, we have been finishing the covering of the edges of the door with sheets of tin then fabricating them to size. Also we have been creating drawings on Pro E for the top rack support of our smoker. We have been grinding the door as well so that it will fit more flush when we put the tin on the edges. Also we have began to install the racks and rack support.
No comments:
Post a Comment